All categories
Compare Cart

LVS03329 - Front plate, PrismaSeT G, for FupacT ISFT 250, vertical fixed, with cut-out, 9M, W300 - Schneider Electric

Expected in 2-4 weeks
LVS03329 - Front plate, PrismaSeT G, for FupacT ISFT 250, vertical fixed, with cut-out, 9M, W300 - Schneider Electric - Front plate, PrismaSeT G, for FupacT ISFT 250, vertical fixed, with cut-out, 9M, W300 - Schneider Electric - 0
LVS03329 - Front plate, PrismaSeT G, for FupacT ISFT 250, vertical fixed, with cut-out, 9M, W300 - Schneider Electric
31,93 €
31,93 € incl. VAT
Text About:
Front plate, PrismaSeT G, for FupacT ISFT 250, vertical fixed, with cut-out, 9M, W300 - Schneider Electric
31,93 €
SPECIFICATIONS
Main
Accessory category Installation accessory
Number of vertical modules [50 mm] 9
Range PrismaSeT
Type of front plate Cut-out
Complementary
range compatibility PrismaSeT (PrismaSeT G) duct
PrismaSeT (PrismaSeT Pack 250) duct
surface finish Textured
Matt
Enclosure/cubicle description Floor-standing duct - width 300 mm
Wall-mounted duct - width 300 mm
Pack enclosure - width 300 mm
Product certifications ASTA
Handle front plate colour 450 mm
Product or component type Front plate
connection position Direct connection
Quantity per set Set of 1
functional unit 300 mm PrismaSeT G floor-standing duct FuPact ISFT250 fixed fuse carriers handle vertical 3P 1 direct 9
300 mm PrismaSeT G wall-mounted duct FuPact ISFT250 fixed fuse carriers handle vertical 3P 1 direct 9
300 mm Prisma Pack 250 Pack enclosure FuPact ISFT250 fixed fuse carriers handle vertical 3P 1 direct 9
Material Steel
width (w) 250 mm
Colour White (RAL 9003)
Net weight 0.74 kg
Operating position Vertical
Installed device FuPact: fixed ISFT250 - control: fuse carriers handle - vertical installation
Poles description 1 x 3P: mounting plate support: ISFT250 vertical installation
Environment
Range of product PrismaSeT G
standards IEC 61439-2
IEC 61439-1
protective treatment Electrophoresis treatment and hot-polymerised polyester epoxy powder
Recently viewed
31,93 €
31,93 € incl. VAT
Expected in 2-4 weeks